Accreditation & Certification

BDA Good Practice
Member Scheme
Investors in the Environment
Gold Standard
NHS Green Plan
Aligned Partner
CQC Waste Audit
Compliance Ready
ISO 14001
Environmental Mgmt

142 Practices Converted. Zero Failed Their Next CQC Waste Audit.

Sustain audits your practice down to the last suction tip — replacing single-use plastics, mercury-laden amalgam waste, and chemical-heavy sterilization cycles with closed-loop systems that cut disposal costs and pass green accreditation on the first attempt.

142
Practices Converted
0
Failed CQC Waste Audits
£38K
Avg Annual Saving
94%
First-Attempt Accreditation

The Numbers

Traditional Practice vs.
Sustain-Converted

Five line items. Real data from 142 converted practices. Click any row to read the case study behind the number.

Line Item
Traditional Practice
Sustain-Converted
Annual Δ
Clinical Waste
Annual Collection Cost
£22,400 / yr
£8,100 / yr
−£14,300 saved

Case Study — Greenfield Dental, Leeds (6 surgery): After switching to segregated waste streams and a reusable instrument kit programme, their annual collection invoice dropped from £22,400 to £8,100 within 11 months. The practice passed its CQC environment review without a single advisory note.

Sterilization
Autoclave Energy Cost
£4,800 / yr
£1,950 / yr
−£2,850 saved

Case Study — Harbour View Dental, Bristol: Replacing two ageing Class B units with a single low-temperature plasma sterilizer and implementing Sustain's load-consolidation protocol cut sterilization energy costs by 59%. Payback period: 26 months. ISO 14001 certification achieved in month 4.

Materials
Single-Use Procurement
£18,600 / yr
£11,200 / yr
−£7,400 saved

Case Study — Northgate Dental Group, Manchester (12 surgeries): Switching to reusable silicone bibs and autoclavable suction systems across all sites reduced annual single-use procurement spend from £18,600 per surgery to £11,200 — a group-wide saving of £88,800 annually, which the CFO presented as an ESG metric in the NHS contract renewal.

Compliance
Penalty & Remediation Cost
£6,200 / yr
£0 / yr
−£6,200 saved

Case Study — Park Lane Dental, London: Before Sustain, the practice had accumulated £6,200 in CQC advisory remediation costs over 18 months. Post-conversion, their next CQC inspection received a "Good" rating across all waste management domains. Zero penalty costs in the 24 months since.

Commercial
Patient Perception Score
61 / 100
88 / 100
+27 pts increase

Case Study — Elm Tree Dental, Edinburgh: Six months after displaying their IfE Gold and NHS Green Plan badges in the waiting room and on Google Business, the practice saw a 34% increase in new patient bookings citing "sustainable practice" as their reason for choosing. Their Google rating moved from 3.9 to 4.7.

Total Annual Saving
£52,000+ / yr
£38,550 saved
avg. per practice

Data derived from 142 converted practices, 2021–2026. Figures represent medians; individual results vary by practice size, location, and existing waste contracts. Full methodology available in the Benchmark Report.

Client Practices

Your neighbours
already switched.

142 practices across England, Scotland, and Wales have completed the Sustain conversion programme.

GD
Greenfield Dental
Leeds · 6 surg.
HV
Harbour View Dental
Bristol · 4 surg.
ND
Northgate Dental Group
Manchester · 12 surg.
PL
Park Lane Dental
London · 3 surg.
ET
Elm Tree Dental
Edinburgh · 5 surg.
RD
Riverside Dental
Cardiff · 8 surg.
TD
The Dental Quarter
Birmingham · 7 surg.
AD
Apex Dental Care
Sheffield · 4 surg.
MD
Millbrook Dental
Exeter · 3 surg.
NP
Northfield Practice
Glasgow · 6 surg.
C&
Crown & Bridge Group
Newcastle · 9 surg.
SD
Sycamore Dental
Oxford · 5 surg.

“The Sustain audit found £34,000 in annual savings we didn’t know existed. We passed our NHS Green Plan review without a single corrective action.”

— Dr. Sarah Okonkwo, Principal, Northgate Dental Group
See Your Waste Score

The Process

From invoice shock
to certified.

Three stages. No guesswork. A fixed timeline from first audit to framed certificate on the wall.

01

The Waste Audit

1 day on-site

A Sustain consultant visits your practice and audits every waste stream — clinical, hazardous, offensive, and recyclable. We measure autoclave cycles, photograph segregation errors, and pull three months of contractor invoices. You receive a 24-page Waste Score report within 5 working days.

24-page Waste Score Report

Outcome

Baseline established. Every cost and compliance gap identified.

02

The Conversion Plan

2–4 weeks

We design your closed-loop replacement programme: specifying reusable instrument kits, low-temperature sterilization equipment, approved amalgam capture systems, and revised SOPs aligned to HTM 07-01. We handle supplier negotiation and staff training schedules.

Conversion Specification + Supplier Contracts

Outcome

Every single-use item has a compliant, cost-lower replacement.

03

Certification & Ongoing

Month 3 onwards

We submit your accreditation applications to IfE, BDA Good Practice, and NHS Green Plan on your behalf. We attend your first CQC inspection as an advisory observer. Post-certification, a quarterly data review ensures savings compound and compliance holds.

Accreditation Certificates + Quarterly Reviews

Outcome

100% first-attempt accreditation rate across 142 practices.

Free Assessment

Your practice is paying
for waste you could eliminate.

The average practice we audit finds £38,550 in annual savings it didn’t know existed. The assessment takes one day. The savings last indefinitely. There is no obligation beyond the audit.

No obligation beyond the audit
First-attempt accreditation guaranteed
NHS Green Plan & CQC aligned

142 practices have already found their waste savings.